First of all we had to travel to the start line. So with bags fully packed (well above the 15kg weight limit, who would have thought lycra could weigh so much), we set off to the Caledonian Sleeper train to Inverness and then a connecting train to Thurso and then a taxi to John O'Groats.
Safely strapped in for a night on the sleeper train.
Adam and I were really quite excited even by a train and taxi ride. The man on the left, Andre, was taking the whole event a little more seriously!!



No comments:
Post a Comment